The Rhodes 22 Discussion Group R22 Discussion Group

The Rhodes 22 Discussion Group


< prior

Back to Month

Go to Thread

Member Picture

John Carlson



Replacing diamondboard pendant

2020-06-14; 17:21:49 EDT

Member Since

2019-04-22

Posts: 24

I didn’t measure my pendant line. That would have been a good idea, but you can shorten it after getting it connected and dropping the board. While you can wait to change the pendant until the boat is on the trailer, you won’t be able to reach the eye on the rear of the diamond board to get to the knot (i.e., from the bottom via the centerboard trunk). The board needs to be dropped down for you to see it, which you can’t (or at least I couldn’t) do on the trailer. All that to say that I think you’ll need to access the board from the top.

Sorry, it looks like my pictures were stripped. One is zoomed in on the knot itself. Here are direct links:

https://www.dropbox.com/s/9vrz6x2kk8q8sqa/IMG_0659.jpeg?dl=0 <https://www.dropbox.com/s/9vrz6x2kk8q8sqa/IMG_0659.jpeg?dl=0>

https://www.dropbox.com/s/mowx4w9438caa7e/IMG_0660.jpeg?dl=0 <https://www.dropbox.com/s/mowx4w9438caa7e/IMG_0660.jpeg?dl=0>

https://www.dropbox.com/s/cgoejpn8rxcmyk2/IMG_0662.jpeg?dl=0 <https://www.dropbox.com/s/cgoejpn8rxcmyk2/IMG_0662.jpeg?dl=0>

https://www.dropbox.com/s/m8j5f5yead07rn2/IMG_0663.jpeg?dl=0 <https://www.dropbox.com/s/m8j5f5yead07rn2/IMG_0663.jpeg?dl=0>

https://www.dropbox.com/s/6flguhguiwch8xw/IMG_0703.jpeg?dl=0 <https://www.dropbox.com/s/6flguhguiwch8xw/IMG_0703.jpeg?dl=0>



John Carlson
2004/2012 Lillipelli


See the original archive post
×

Message to Webmaster:

To use your email application to send a messsage to the webmaster rather than this form, .



×

Post to the Rhodes 22 Email List:



×

Sending Post:

Your post is being sent... waiting