The Rhodes 22 Discussion Group R22 Discussion Group

The Rhodes 22 Discussion Group


< prior

Back to Month

Go to Thread

Member Picture

Graham Stewart



Preparing for Isaias

2020-08-05; 15:33:09 EDT

Member Since

2005-04-29

Posts: 814

On my boat none of the bolts holding the genoa rail were not through bolted
as was the case for the transom rings. In the latter case either the nuts
fell off or were never installed. In the case of the genoa track the bolts
were too short to allow for nuts so I think that was by design. In spite of
the fact that the track had held for 40 years with no sign of letting go I
still decided that I would sleep better with nuts and washers installed so I
made that alteration. 

The other problem with bolds being screwed directly into the fiberglass is
that cracks developed in the gel coat radiating out from the holes that only
became visible when I removed the track to paint the deck. Slightly
enlarging the hole for the bolts to slide through and champhering the
gelcoat at the hole should alleviate that problem - but I don't intend to
remove the track to know for sure.

Graham Stewart
Agile, Rodes 22, 1976
Kingston Ontario


See the original archive post
×

Message to Webmaster:

To use your email application to send a messsage to the webmaster rather than this form, .



×

Post to the Rhodes 22 Email List:



×

Sending Post:

Your post is being sent... waiting