< prior
Back to Month
Go to Thread
2020-08-30; 23:05:32 EDT
Member Since
2018-03-19
Posts: 105
That’s brilliant Jesse! Mike Riter SV EmmaBSee the original archive post
On Sun, Aug 30, 2020 at 10:23 PM Tom Van Heule < tom.vanheule at intrinsicprograms.com> wrote: > That's very helpful. I see. Need to have the board down enough to access > > the knot. > > > > Thanks Jesse. > > > > On Sun, Aug 30, 2020, 8:46 PM Jesse Shumaker < > jesse.laten.shumaker at gmail.com> > > wrote: > > > > > Hi Tom, you can't access the attachment point on the DB from underneath > > > when the boat is on the trailer because the DB is retracted and that part > > > is inside the trunk. From what I've read on other posts, when the boat > is > > > on the trailer, you can take off the gasket on top of the keel and > replace > > > the pennant from above. From the stories on that topic, it sounds like > > > that process involves a lot of screws/bolts and typically some salty > > > language. > > > > > > Jesse Shumaker > > > S/V Zephyr > > > > > > On Sun, Aug 30, 2020, 7:39 PM Tom Van Heule < > > > tom.vanheule at intrinsicprograms.com> wrote: > > > > > > > Great write up Jesse. > > > > This makes logical sense. So if you weren't scuba you could do this on > > > the > > > > trailer too I'd guess? > > > > > > > > On Sun, Aug 30, 2020, 7:31 PM Jesse Shumaker < > > > > jesse.laten.shumaker at gmail.com> > > > > wrote: > > > > > > > > > As noted in some prior posts, my diamondboard pennant line was > starting > > > > to > > > > > wear through at the point where it was cleated while the diamondboard > > > was > > > > > pulled up. > > > > > > > > > > My R22 is a 1991 that was refurbished in 2013. This vintage has the > > > > > diamondboard pennant line that runs straight through without any > blocks > > > > > involved. After it was replaced, I measured the old pennant line and > > > it > > > > > was 53" from the knot on the bottom to the knot above the handle. > For > > > a > > > > > replacement line, I purchased a 25' (much longer than needed - more > on > > > > that > > > > > in a minute) length of 1/4" Paracord. It appears to have a very > > > durable > > > > > jacket and plenty of strength. We'll see how it holds up. > > > > > https://www.amazon.com/gp/product/B018XZYFK4 > > > > > > > > > > In order to avoid removing the diamondboard cap and replacing the > line > > > > from > > > > > above while on the trailer, I took the following approach on the > water > > > > this > > > > > morning and it worked well. It requires SCUBA gear, or more lung > > > > capacity > > > > > than I have to hold my breath. > > > > > > > > > > - Extend the centerboard using existing centerboard line to hold > in > > > > > place at an extended position > > > > > - Put in place a bridle using a line that goes from the fairlead > and > > > > cam > > > > > cleat on one side of the cabin, run it under the boat and under > the > > > > > diamondboard back up to the matching cam cleat on the other side. > > > > SCUBA > > > > > person checks the placement of this bridle line. > > > > > - Put some extra tension on the bridle line to lift the > > > diamondboard a > > > > > few inches so that you have a few inches of slack on the normal > > > > > diamonboard > > > > > pennant line. I put on a couple of vice grips on the diamondboard > > > > > pennant > > > > > line just where it comes out of the hole as a safety measure in > case > > > > the > > > > > bridle slipped. > > > > > - I had to cut the pennant line at the knot above the handle > > > because I > > > > > couldn't get the knot untied. At this point, I was committed > making > > > > > this > > > > > replacement project work. > > > > > - Remove the handle from the line > > > > > - Sew the top end of the old line to the bottom end of the new > line > > > > > together (end to end) using normal needle and thread > > > > > - SCUBA person pulls on the old line underwater and this pulls > > > through > > > > > the new line. My pennant line just had a stopper knot and the > SCUBA > > > > guy > > > > > could pull that through and keep pulling enough extra line through > > > so > > > > he > > > > > could bring up the old line to the surface so we could see the > > > stopper > > > > > knot, all the old line and where it attaches to the new line. > > > > > - Cut the thread that joined the two lines, and tie a stopper knot > > > in > > > > > the end of the new line. > > > > > - While the SCUBA guy goes below to make sure the line runs > through, > > > > > person in cockpit pulls back out the new line until it is to the > > > point > > > > > of > > > > > tension > > > > > - Thread the handle onto the new line > > > > > - Tie on a stopper knot above the handle, leaving a the same > amount > > > of > > > > > extra line that was there on the old line (since we had pulled the > > > > > diamondboard up a few inches to give extra line to work with). > > > > > - Test raising the diamondboard. > > > > > - I left a longer tail on the new line and wrapped it around the > > > > handle > > > > > number of times before cutting it so that if I need to make some > > > > > adjustments in the future I have some extra line to work with > > > > > - Once satisfied that everything is tied properly and at the > > > > appropriate > > > > > length, remove the bridle. > > > > > - Job done, thank your SCUBA friend for helping! > > > > > > > > > > I attached a few photos. > > > > > > > > > > Jesse Shumaker > > > > > S/V Zephyr > > > > > -------------- next part -------------- > > > > > A non-text attachment was scrubbed... > > > > > Name: OldDBpennant.JPG > > > > > Type: image/jpeg > > > > > Size: 73702 bytes > > > > > Desc: not available > > > > > URL: < > > > > > > > > > > > > > http://rhodes22.org/pipermail/rhodes22-list/attachments/20200830/31a9f4f6/attachment.jpe > > > > > > > > > > > -------------- next part -------------- > > > > > A non-text attachment was scrubbed... > > > > > Name: OldDBpennantCleatedNotAllTheWayUp.JPG > > > > > Type: image/jpeg > > > > > Size: 48768 bytes > > > > > Desc: not available > > > > > URL: < > > > > > > > > > > > > > http://rhodes22.org/pipermail/rhodes22-list/attachments/20200830/31a9f4f6/attachment-0001.jpe > > > > > > > > > > > -------------- next part -------------- > > > > > A non-text attachment was scrubbed... > > > > > Name: NewDBpennantHandle.JPG > > > > > Type: image/jpeg > > > > > Size: 58018 bytes > > > > > Desc: not available > > > > > URL: < > > > > > > > > > > > > > http://rhodes22.org/pipermail/rhodes22-list/attachments/20200830/31a9f4f6/attachment-0002.jpe > > > > > > > > > > > -------------- next part -------------- > > > > > A non-text attachment was scrubbed... > > > > > Name: NewDBpennant.JPG > > > > > Type: image/jpeg > > > > > Size: 48591 bytes > > > > > Desc: not available > > > > > URL: < > > > > > > > > > > > > > http://rhodes22.org/pipermail/rhodes22-list/attachments/20200830/31a9f4f6/attachment-0003.jpe > > > > > > > > > > > > > > > > > > > > -- Michael Riter President, Trail Design Specialists, Inc. Lead Instructor, Trail Master and mechanized training mike at traildesign.com 678-410-8021
To use your email application to send a messsage to the webmaster rather than this form, .
Your post is being sent... 