2020-10-30; 13:50:18 EDT
Member Since
2019-09-05
Posts: 3
?Secure a line to the bow leading through the chock and back on outside of all lines and secure it to a station. Attach to the end of the line a sturdy snap shackle. Deploy the anchor from the cockpit to the desired length. Tie a loop knot in the anchor line and snap the bow line to the loop. The anchor rode will then transfer its load to the bow of the boat. Retrieve from the cockpit unsnapping the bow line and untying the loop knot. Butterfly-Knot-Pictures.jpegSee the original archive post