The Rhodes 22 Discussion Group R22 Discussion Group

The Rhodes 22 Discussion Group


< prior

Back to Month

Go to Thread

Member Picture

John Lock



Rigging discussion, extra forestay(s)

2009-07-28; 14:14:37 EDT

Member Since

2006-07-22

Posts: 814

Art's addition of a furling spinnaker attached to the reinforced bow  
pulpit reminded me of a sail plan change I have been contemplating.   
So I thought I would run it by the list for comments.

I saw an article recently about a guy (on a much larger boat) who had  
added an inner forestay about six inches behind the main forestay.   
This ran to a mast "hound" (it was called) on the mast six inches  
below the masthead where the main forestay attached.  The result was a  
hank-on jib stay running six inches inside the main forestay.  He used  
this for a smaller, working jib and furled a big genoa on the main  
forestay.

So I was thinking.... could this be applied to the much smaller Rhodes  
as well?  Attachment to the mast is easy.  Attaching a strong point to  
the deck just behind the furling drum is the tricky part.  I might be  
tempted to add this to fly a 110% jib for upwind sailing and replace  
the big genoa on the main forestay with a furling UPS for offwind.

But I don't know how to calculate the load on the inner forestay and  
engineer/install a deck attachment that would be strong enough.

Cheers!
John Lock
~~~~~~~~~~~~~~~~~~
s/v Pandion - '79 Rhodes 22
Lake Sinclair, GA
~~~~~~~~~~~~~~~~~~


See the original archive post
×

Message to Webmaster:

To use your email application to send a messsage to the webmaster rather than this form, .



×

Post to the Rhodes 22 Email List:



×

Sending Post:

Your post is being sent... waiting