The Rhodes 22 Discussion Group R22 Discussion Group

The Rhodes 22 Discussion Group


< prior

Back to Month

Go to Thread

Member Picture

Chris Cowie



Rigging discussion, extra forestay(s)

2009-07-28; 16:48:24 EDT

Member Since

2008-04-26

Posts: 845

the list previously had a lengthy discussion about the Doyle UPS sail that
some have added.  the Doyle price sheet includes an option for a furling
kit.  I assume that anyone with a furling genoa in place and the UPS sail
(without the optional furling kit) would have the UPS sail on a seperate
stay/halyard that would need to be removed when not in use in order not to
be in the way of the furling Genoa?  Does the temporary stay hang down the
side of the mast when no in use?  Or does some sort of halyard system allow
the stay to be easily removed?  Does anyone have two furling sails, UPS and
Genoa in place at the same time?  Seems like the UPS would restrict the
Genoa?



Leland wrote:
See the original archive post
×

Message to Webmaster:

To use your email application to send a messsage to the webmaster rather than this form, .



×

Post to the Rhodes 22 Email List:



×

Sending Post:

Your post is being sent... waiting