2015-05-10; 16:02:09 EDT
Member Since
2014-05-06
Posts: 3821
Stan, Are just the machine bolts threaded into the plywood core sufficient to attach the mast hoist cabin roof block for the initial installation? Is nothing more needed to protect against water intrusion into the core? To re-attach a torn out mast step plate from a rotted base, I did pretty much did what you advise for the mast hoist block. That is, to take the plate attachment screws, I pushed wood dowels slightly wider than the screws into still soft penetrating epoxy. When a rum imbibed mast crane operator thought he was pulling a keel stepped mast, damage to the cabin roof gelcoat was disastrous. How would it be any different with the way you re-attach the mast hoist block? Wearing my fire suit, RickSee the original archive post