I just completed installing the new lower chainplates and cabin handrails
and attach some photos for those  who might be interested in these projects.

I removed the lower chainplates by grinding out a fairly large area and then
filled the space with epoxy and sawdust. This created a very solid core that
gave what I hope and expect will be a good place for the new forged eye
bolts that I am using as the new lower chainplates that bolt through the
cabin top. They are sealed with butyl. They cost about $14 each in Canada -
about double the price in the US.

I replaced the original teak handrails with and 18" and a 24" rail on each
side. I also installed 9" handrails at the front of the cockpit. They are
thru-bolted and sealed with butyl after filling the hole with epoxy and
thickener. The six rails cost about $120 Canadian. They should be
maintenance free and, I think, look good with the new windows.

Butyl, aside for its excellent qualities as a sealant, is also wonderful to
work with. Given that I do everything a minimum of two times (if I am lucky)
and in the case of the handrail installation, multiple times, it was
remarkably easy to remove the rails and clean up the butyl left behind.
Butyl sticks poorly to everything except itself. As a result you don't need
to mask the area as you can just lift off the butyl that squeezes onto the
deck. To get the tiny bits you can just dab them with a ball of butyl. No
gloves needed. Butyl never hardens so you have no time limits around
installation of cleanup. I can't imagine doing this task with sealant. 

The deck looks white in the photo but actually it is an off-white on the
brown side (System Three Whidby white). 

Next job, if I can get to it before it gets too cold, is to paint the
non-skid areas with Kiwigrip. Then, time permitting, will be the rest of the
deck hardware.


Graham Stewart
Agile. R22, 1976
Kingston Ontario Canada





Filling lower shroud holes.jpg

Blue wave forged eye bolts for lower chainplates.jpg

Forged eyebolts installed for lower chainplates.jpg

Handrails and chainplates installed (4).jpg
See the original archive post
×

Message to Webmaster:

To use your email application to send a messsage to the webmaster rather than this form, .



×

Post to the Rhodes 22 Email List:



×

Sending Post:

Your post is being sent... waiting