The Rhodes 22 Discussion Group R22 Discussion Group

The Rhodes 22 Discussion Group


< prior

Back to Month

Go to Thread

Member Picture

Graham Stewart



New Video - Cabin Floor

2016-11-30; 20:30:28 EST

Member Since

2005-04-29

Posts: 816

Great video Peter. I enjoyed watching you build the floor as well as the tour of your impressive shop. 

Last month I finished installing the floor in Agile. I used 1/2 in. plywood?  which I sealed with epoxy and then covered with sheet vinyl that I attached with contact cement. I also installed 5 large hatches to get below the floor. It makes for rugged, water resistant, non-skid and easily cleaned surface. I can only hope that the contact cement holds through the winter deep freeze. Of course it isn't very nautical but this time around nothing goes into my boat that requires maintenance. I have a classic mahogany boat where absolutely everything requires continuous maintenance and that is enough for me.

In installing the structure for the floorboards I used 3/4 inch angle aluminium that I bolted to the side panels. Along with making new stringers, that  allowed me to drop the floor about 1 inch from the way it was before I started. That is not much but at my height every inch of head room is a precious thing. 

Graham
Sent from BlueMail ?

See the original archive post
×

Message to Webmaster:

To use your email application to send a messsage to the webmaster rather than this form, .



×

Post to the Rhodes 22 Email List:



×

Sending Post:

Your post is being sent... waiting