2018-10-12; 23:23:49 EDT
Member Since
2005-04-29
Posts: 816
I thought I sent the final update on my Rhodes 22 interior rebuild last June but so far as I can tell I just sent it to myself. So I am sending it out again. My apologies if this is a duplicate. Graham _____ A long time ago I was asked to post pictures of Agile's interior when it was completed. Well I have finally finished the interior and can post those pictures. There is nothing fancy about the interior. Certainly nothing like the amazing carpentry of Peter Nyberg. My goal was to be efficient, cheap and as maintenance free as possible. There are a few bits of teak - mostly left over from my previous install but all surfaces now are white Formica cladding over the original or replacement plywood. Much of the trim is aluminum and PVC. As I mentioned before, I shortened the galley by about 8" in order to install a hanging locker. I use it for safety vests and rain gear but occasionally a garment bag with good clothes when we are cruising and want to get dressed up a bit. Instead of an ice box built in to the counter I use a portable cooler that sits between the seat and the locker in front of the companion way. This works very well for me. The cooler is quite large, portable, provides a step into the boat, takes up previously unused space and, as it unexpectedly turned out, also serves to hold the companionway doors in front of the galley storage drawers when underway. That locations turns out to be very convenient, takes up no space and also serves to keep the galley drawers closed when on a port heel. For water I found a 23L (6 gal) jerry can that just fits under the sink. I installed a deck fill for water but have not connected it to the tank. It is easier for me to take the tank to the water than bring water to the tank but the deck fill is there when or if I or a subsequent owner needs it. On my boat the holding tank deck outlet was within a foot of the potable water deck fill on the starboard side deck. I was very uncomfortable with that arrangement so when I rebuilt the deck and replaced the holding tank I moved the tank outlet to the other side (port) of the boat. The drawers are just plastic drawer units that I bought for $35. It will be interesting to see if they last more than a few days. They come in a unit of three drawers and that was too high to fit so I cut off the bottom drawer and put in a spacer that gives me a 4" space under the unit which, as it turns out, is just the right size to store my portable three burner propane stove. We never cook down below so using a propane stove is not a problem and using a portable stove saves space on the galley counter. The floor is completely rebuilt from the hull up. The old stringers were in bad shape and the structure under the compression post was crushed and rotted so I had to replace everything. The new stringers are made of pressure treated pine 5/4" deck boards that have been encapsulated in multiple coatings of epoxy. The floor sits on the stringers and on aluminum angle pieces running the length of the cabin at the base of the side seats and under the galley. It is bolted down to the stringers using metal insert nuts and to the aluminum rails using aluminum insert nuts. Previously wood screws were used and over the years the screw holes became enlarged or worse and the floor boards were always loose. Hopefully this arrangement will address that problem. The floor itself is 1/2" interior grade plywood that I coated in several coats of epoxy and painted with a marine grade paint. The top is covered with a vinyl cushion floor that is attached with contact cement. It should be very low maintenance and nom-skid. It also brightens the interior considerably from the dark stained wood that was there before. It has gone through one severe winter and there are no signs that the cushion floor is lifting - so far. There was some discussion on the list about whether 1/2" floor boards would be adequate. I have found it to be quite adequate with no sense that they are soft. Maybe the 3/4" boards would be better if the people using the boat are much heavier that Deb and I. The advantage of the thinner boards is that they are lighter and much easier to manhandle when they need to be removed. Also, at 6'3" I appreciate every fraction of an inch of head space. I put the electrical panel on the main bulkhead. It is really unused space and makes it very easy to service the panel from the back. I added a small unit I got from Amazon that provides a power outlet that I use to trickle charge the battery with a small portable solar charger. It also has two USB charging outlets and a voltmeter. I really like being able to monitor the battery charge so easily. Instruments and lights are the only items that draw power and I replaced all lights with LEDs. I decided that all I really need is a little garden tractor battery. I used big deep discharge batteries before but found that inevitably they were shot after a few years. I am hoping that with the low draw and ability to monitor its state that this inexpensive battery will suffice. We will see. Window frames are made of PVC trim pieces. In the final analysis the interior is a pretty bare bones interior but the boat being a 1976 has always been a modest boat and does not justify going to great expanse to refurbish. Lord knows I have already spent lots on it. I did splurge on new interior cushions as the old ones were utterly shot. That spruces things up a lot. The hull interior, where exposed, is covered with indoor/outdoor carpeting. Graham Stewart Agile. R22, 1976 Kingston Ontario Canada Interior final June 2018 (3).jpg Interior final June 2018 (4).jpgSee the original archive post